Skip to content
KOTA WORLDLINK

Machinery and Industrial Equipment

Machines, spare parts and industrial equipment move in containers, on flat racks or by air for urgent parts.

Sea, Air, Road, Rail · 22G1, 42G1, 45G1, PMC

Cargo file

Examples
Production lines, Pumps and compressors, Generators, Spare parts, Tools and instruments
Equipment
  • 20' / 40' dry container
  • 40' HC
  • Flat rack / open top (oversize)
  • Air freight (spare parts)
Modes
Sea, Air, Road, Rail
Rules and papers
Invoice, packing list, B/L or AWB
What you provide
Cargo description and HS code, weight and dimensions, packing, origin and destination, ready date, Incoterm.

What to watch

Machines, spare parts and industrial equipment move in containers, on flat racks or by air for urgent parts. Packing, moisture protection and correct HS classification are the main points.

Used machinery can attract import restrictions and need a pre-shipment inspection in some countries.

Rust protection (VCI film, desiccant) is recommended for sea transport.

Dual-use and sanctioned destinations need export-control checks before booking.

Stacked shipping containers and handling equipment at a container terminal

Typical lanes

Indicative market values for planning, not schedules. The calculator shows the current range.

Papers checklist

What this cargo usually needs. The importing country and the carrier decide the final list.

Invoice, packing list, B/L or AWB

  1. 1Commercial invoice
  2. 2Packing list
  3. 3Certificate of origin
  4. 4Bill of lading / air waybill
  5. 5Technical specification or conformity documents (e.g. CE)
  6. 6Export licence for dual-use items

Related cargo

Tell us what, from where, to where.

Or call the desk: +971 50 347 5085